some tracking script

24-Hour Turnaround at ROC Carbon Leaves Our Competitors in the Dust

24 hour turnaround

Get 24-hour turnaround on manufactured parts from ROC Carbon

Do you need production-run or one-of-a-kind small-quantity parts as soon as possible? You may be used to shutting down production due to not having quick access to the parts you need to operate. Luckily, with our 24-hour turnaround at ROC Carbon, that’s a problem of the past. Unlike our competitors, we are able to manufacture and ship the parts you need in a matter of hours. Learn more about how we leave our competitors in the dust.

https://www.youtube.com/watch?v=BwyjfiZL53s

Why Choose ROC Carbon? 

Downtime in any industry is never a good thing. Unfortunately, most machine downtime occurs due to the time it takes to get the parts you need due to material unavailability. In fact, the average cost of downtime in manufacturing is $260,000 per hour. Fortunately, our team at ROC Carbon understands the importance of keeping your downtime low and we’re able to provide a 24-hour turnaround on most of our manufactured parts. With such a quick turnaround time, you don’t have to wait around for days, weeks, or months for the parts you need to keep your operation running. We supply parts not only to original equipment manufacturers, but also to repair shops and end-users such as petrochemical plants, refineries, power plants, and the marine industry.

Our Products with 24-Hour Turnaround Times

At ROC Carbon, we manufacture a variety of crucial refinery items that you need ASAP. These products include seals, rings, bearings, and bushing materials. But you probably need more than that. We also offer technical support, reverse engineering, and custom drawings. In need of specialty carbon or graphite products? We have you covered with those too. With durability and reliability in mind, we manufacture ball valve seats, wear plates, washers, piston rider rings, rotary joint sealing rings, spherical bearings, and more.

Unlike our competitors, we realized over 60 years ago the need to be responsive and meet the needs of our customers, such as fast turnaround on parts like bushing, bearings, and seals. That’s why, over the years, we have increased our product lines to ensure a quick 24-hour turnaround for any customer in need. Because of this turnaround, our competitors are left in the dust.

Contact us today to get the parts you need when you need them!

Share This

Facebook
Twitter
LinkedIn
Email

Related Articles